Incident Status Summary (ICS-209)

1: Date
08/31/2011
2: Time
1015
3: Initial   |   Update   |   Final
             |                |    XX
4: Incident Number
WA-WFS-206
5: Incident Name
Wishram II
6: Incident Kind
Wildfire
(Full Suppression/Perimeter Control)
7: Start Date    Time
08/29/2011 1100
8: Cause
Under Investigation
9: Incident Commander
Dennis Mason
10: Incident Command
Organization
Type 3 Team
11: State-Unit
WA-WFS
12: County
Klickitat
13: Latitude and Longitude
Lat:
45° 39´ 55"  Long: 121° 0´ 30"
Ownership: WA-WFS
14: Short Location Description (in reference to nearest town):
1 west of Wishram on SR14
15: Size/Area
Involved
11,008 ACRES
16: % Contained
or MMA
100 Percent
17: Expected Containment
Date:
08/31/2011
18: Line to Build
19: Estimated Costs
to Date
$200,000
20: Declared Controlled
Date:
08/31/2011
Time:
1800
21: Injuries this
Reporting Period:
22: Injuries
to Date:
23: Fatalities 24: Structure Information
0 0  0 Type of Structure # Threatened # Damaged # Destroyed
25: Threat to Human Life/Safety:
Evacuation(s) in progress ----

No evacuation(s) imminent --

Potential future threat --------

No likely threat ---------------
Residence 0 0 0
Commercial Property 0 0 0
Outbuilding/Other 0 0 0
26: Projected incident movement/spread 12, 24, 48, and 72 hour time frames:
12 hours:

24 hours:

48 hours:

72 hours:
27: Values at Risk: include communities, critical infrastructure, natural and cultural resources in 12, 24, 48 and 72 hour time frames:
12 hours:

24 hours:

48 hours:

72 hours:
28: Critical Resource Needs (amount, type, kind and number of operational periods () in priority order in 12, 24, 48, and 72 hour time frames):
12 hours:

24 hours:

48 hours:

72 hours:
29: Major problems and concerns (control problems, social/political/economic concerns or impacts, etc.) Relate critical resources needs identified above to the Incident Action Plan.
Steep rocky terrain, wind farm generators on top of ridges; weather (wind)
30: Observed Weather for Current Operational Period
Peak Gusts (mph):
30    Max. Temperature: 76
Wind Direction: W       Min. Relative Humidity: 26
31: Fuels/Materials Involved: 1 Short grass (1 Foot)
Grass and Sage
32: Today's observed fire behavior (leave blank for non-fire events):
33: Significant events today (closures, evacuations, significant progress made, etc.):
34: Forecasted Weather for next Operational Period
Wind Speed (mph):
    Temperature:
Wind Direction:        Relative Humidity:
35: Estimated Control
Date and Time:
36: Projected Final Size:
37: Estimated Final Cost:
38: Actions planned for next operational period:
Will be turning incident back to local control around 18:00; Demobing resources began this morning.
39: For fire incidents, describe resistance to control in terms of:
1. Growth Potential - Low
2. Difficulty of Terrain - High
40: Given the current constraints, when will the chosen management strategy succeed?
8-31-2011 at 18:00
41: Projected demobilization start date: 08/31/2011 0600
42: Remarks:
Handcrews and Wildland Engine Strike Teams being released.
 
43: Committed Resources
Agency CRW1 CRW2 HEL1 HEL2 HEL3 ENGS DOZR WTDR OVHD Camp
Crews
Total
Personnel
SR ST SR ST SR SR SR SR ST SR ST SR SR
LGR                 7     5 17   108
PRI                   2     2   2
ST   4                     2   60
Total 0 4 0 0 0 0 0 0 7 2 0 5 21 0 170
44: Cooperating and Assisting Agencies Not Listed Above:
45: Prepared by:
Ryan FIsher
46: Approved by:
Dennis Mason
47: Sent to:NWCC by: Dan Johnson
Date:
08/31/2011 Time: 1015